A-201Case study — Kansas Football

Case study · Jack Porter · Lawrence, KS

Anderson Family Football Complex.

One sub-project inside the $450M Gateway District Phase 1 renovation of David Booth Kansas Memorial Stadium: ops-building upgrades with a new team room and 20,000 square feet of walkthrough space. This sheet covers the two spaces I was tasked with.

Sheet no. A-201 Case study — Kansas Football
SiteDavid Booth Kansas Memorial Stadium
CityLawrence, Kansas
FirmJack Porter
Design directorJake Andrews
Drawn byStephen Fay — junior designer
ScopeSchematic design + DD adjustments
ScaleNTS
StatusOpened summer 2025
Gear display, wide view: six uniformed mannequins on a platform between chevron light-baton walls, a backlit adidas logo wall at the rear, and a mirrored ceiling doubling the room.
Kansas Football · Operations facility A recruiting tour that never breaks character Jack Porter · Lawrence, KS · opened summer 2025 Fig. 0 — as built
Revisions — how the rooms got this way
MarkIssueDescription
Baseline Ceiling materiality + the lit Jayhawk divider inherited at roughly 80% realized.
SD Gear display + hype tunnel concepts tasked to the junior designer.
Client Client requests a light show in the tunnel.
Rework Paint schemas + lighting patterns workshopped, many rounds. Repeating offset diagonals hold.
Add Light boxes on the diagonals — waving the wheat (J. Andrews).
As built Opened summer 2025. An amalgam of the team’s concepts.

Brief

A-201 · 1.0

The numbers are in the title block: $450 million across Gateway District Phase 1, a new team room and 20,000 square feet of walkthrough space in this one ops building, doors open summer 2025. What a title block can’t hold is how the work was divided — so this sheet starts there.

“I was a junior designer working under design director Jake Andrews and was tasked with the gear display and hype tunnel concepts.”

My lane was schematic design, then small adjustments as design development tightened the details. No technical drawings — my Jack Porter work was design only.

Program — ops building
  • Team roomnew
  • Walkthrough space20,000 sq ft
  • Gear displayconcept — S. Fay, sect. 2.0
  • Hype tunnelconcept — S. Fay, sect. 3.0

Gear display

A-201 · 2.0

A space for six mannequins showing off the uniform redesigns — that was the brief. By the time I came on, the ceiling materiality and the lit Jayhawk divider were about 80 percent realized. Good inheritance, but someone still had to land the room, and Jake was consumed by the firm’s flagship project.

“Jake had his plate full with our flagship project and needed me to take it the rest of the way.”

Taking it the rest of the way meant three additions, keyed 2.1–2.3 in the legend. The red tags are mine; the ink tags were already on the table when I sat down.

Why the batons

“I wanted the lighting behind the mannequins to give the display a sense of movement”

Gear display, reverse angle: the mannequin line, the backlit adidas wall, and the mural-and-Jayhawk corner in a single frame.
2.0 · As built Every move in one frame — the line, the adidas wall, the mural corner Keynotes 2.1–2.3 · inherited items A–B Fig. 2-A
Keynotes — 2.0
Added — S. Fay

2.1Transition mural. Player photos in orange and red stripes, carrying the display out into the wider hall — one graphic on double duty, corridor and display.

2.2adidas wall. Bold, backlit branding — the partnership matters to recruiting.

2.3Chevron light batons. Behind the mannequin line, answering the lit logo across the room.

Inherited — ~80% realized

ACeiling materiality. The mirrored lid, already resolved when I came on.

BLit Jayhawk divider. The backlit vintage walking Jayhawk. It has a second face — see detail D1, section 3.0.

Built result: an amalgam of the team’s concepts — see rev △5.

Gear display entry corner: the backlit vintage walking Jayhawk on the divider wall beside the player-photo transition mural striped in orange and red.
2.1 · Transition mural The entry corner: inherited Jayhawk, added mural, one seam Fig. 2-B · as built
Close-up down the mannequin line; a Jayhawk-wrapped helmet with a red facemask sits in the foreground.
2.0 · Detail Down the line — a Jayhawk-wrapped helmet holds the foreground Fig. 2-C · as built
2.4 · Shoe display Exists in the space. Poorly photographed. Not pictured on this sheet.
General notes

Site conditions

These notes govern section 3.0.

N1 · BudgetThe tail end of a $450 million renovation. Budgets tighten at the tail end, and programmable light shows are expensive.

N2 · WallsOld construction — CMU. A furred wall came off the block to carry the wiring.

N3 · AreaA large surface area to cover.

Hype tunnel

A-201 · 3.0

The light show.

Jake and the graphics department had already worked out the large fabric player graphics. Then the client asked for a light show — see notes N1–N3 — and Jake and I started workshopping paint schemas and lighting patterns. Many rounds of both. What held was a system of repeating offset diagonals.

“Jake had the idea of adding a light box to them to represent ‘waving the Wheat’ ... which took it over the top”

Tradition — waving the wheat

Touchdowns and victories: Kansas fans raise their arms and sway like wheat in wind. Jake’s light boxes were added to the diagonals to represent it.

Hype tunnel in its red state: WAVE THE WHEAT and ROCK CHALK JAYHAWK letterforms lit red down both walls, the WE WILL sign at the end of the tunnel.
The same view in the blue state: letterforms and light batons in Kansas blue, the WE WILL sign still centered.
3.0 · States — blue / red Down-tunnel to the WE WILL sign — same view, one cue later Figs. 3-A / 3-B · as built Drag the rail

Detail D1 — the double-sided Jayhawk

The gear display’s lit Jayhawk divider has a second face: the logo is mirrored on the reverse of the same wall, positioned so that coming back up the tunnel from the field it sits centered in the entrance. That move is Jake’s, start to finish.

Cross-reference: keynote B, section 2.0 — the same wall, seen from its display side.

Looking back up the hype tunnel mid-change, red shifting to blue, the mirrored backlit Jayhawk centered in the tunnel entrance.
D1 · Up-tunnel The walk back up ends centered on the Jayhawk Mirrored backlit divider · J. Andrews Fig. 3-C · as built

Credits

A-201 · 4.0

No signature moves on this sheet. What it proves is narrower and more useful: I can take someone else’s 80 percent and land it, hold my own concepts loosely enough to share them, and work inside a hierarchy without disappearing into it.

As-built record

I never saw the finished rooms in person. The photographs on this sheet are the as-built record.

“FWIW Jake is the best designer I have ever worked with.”